RR 501K Turbine Generator Controls Retrofit With Water Injection Added (Alberta, Canada)

Tarco’s Scope:

  • Electrical design and drafting
  • Programming of the GE PLCs
  • Procurement of all control system hardware
  • Construction of control cabinets
  • Commissioning and site acceptance procedures
  • Training of plant staff
  • Network design and communications work to enable the duplex communications between the new control systems supplied with the main station control system
  • Load sharing design and commissioning to share load between the two gas turbines, as well as the recip power generator units.
  • This involves the automation of a power plant that utilizes gas turbines as prime movers. Controls included power balancing and load sharing of the gas turbine generator systems. Control was completed on the GE PLC platform.